Privacy and Security Notice_
 


National Spherical Torus Experiment (NSTX) Upgrades


 



 

PROGRAMMATIC AND PHYSICS MOTIVATION FOR THE NSTX UPGRADES

OVERVIEW

o   Requirements

o   NSTX Upgrade Projects Nuclear Hazards Assessment

o   NSTXU Construction Photographs

REPORTS AND PRESENTATIONS

o   Conference Presentations

o   Project Meetings/Status Reports

o   Center Stack Upgrade Project

o   NBI Beam Line 2 Upgrade Project

OTHER LINKS

o   NSTX Operations

o   MAST

 

PROJECT DOCUMENTS

o   Upgrade Project CD-0 Authorization

o   CD-1 ESAAB Presentation

o   Acquisition Strategy

o   Alternate Analysis and Cost Range (CD-1)

o   Final Project Execution Plan

o   CD-2 Approval Documents

§  CD-2 ESSAB

§  CD-2 Approval

o   NSTX Facility Upgrade NEPA Form 1463-09

o   Preliminary Hazards Analysis Report  (CD-1)

o   Hazards Analysis Report (CD-2) 

o   Hazards Analysis Report (CD-3) 

o   NSTX Upgrade Health and Safety Plan

o   Davis Bacon Determination

o   NSTX Upgrade Project Site Vulnerability Assessment Request & Response

o   OMB-300

o   FY11 NSTXU OMB-300

o   FY12 NSTXU OMB-300 

o   FY13 NSTXU OMB-300

o   Integrated Project Team Charter

o   EVMS Acceptance Letter

o   CD-3 Approval Documents

§  CD-3 Approval

Original NSTX Memos/Data on Alignment Errors
    (Need Updating — but shows the 5 mm allowable)

o   PF Coil Alignment and Field Errors (13-990223-CLN-01) 

o   PF Coil Error Fields in NSTX   (971108-PPPL-CKessel-01)

o   NSTX Coil Alignment Data

Reviews

o   NSTX Upgrade Project Reviews Recommendations Log

o   CSU Peer Review (August 13-14, 2009)

o   CSU Peer Review (April 29, 2010)

o   CSU Peer Review (May 18, 2011)

o   NBIU Peer Review (March 3, 2010)

o   NBIU Decon Peer Review (April 21, 2010)

o   NBIU Peer Review (April 19, 2011)

o   Conceptual Design Review (Oct 28-29, 2009)

o   CDR Committee Final Report

o   Preliminary Design Review (June 23-24, 2010)

o   PDR Analysis Report (Update of the CDR Analysis Report)

o   PDR Closeout Presentation

o   External Independent Review (October 2010)

o   Final Design Review (June 2011)

o   Close Out Presentation

o   FDR Committee Final Report

o   PU-PPPL EVMS Review (October 2011)

o   Close Out Presentation

o   Final Report

o   PU-PPPL EVMS Surveillance Review (November 2012)

o   Final Report

o   Office of Science (Lehman) Reviews

o   August 10-11, 2010

o   Final Report

o   December 15-16, 2009

o   October 26-27, 2011

o   Close Out Presentation (Oct 27, 2011)

o   May 2-3, 2012

o   Close Out Presentation (May 3, 2012)

o   Final Report

o   December 11-12, 2012

o   Close Out Presentation (December 12, 2012)

o   Final Report

o   October 2-3, 2013

o   Close Out Presentation (October 3, 2013)

o   Final Report

o   February 4, 2014

o   Close Out Presentation (February 4, 2014)

o   Final Report

o   Readiness to Operate Review (December 9-11, 2014)

 

o   NSTXU Restart External Review

 

 

NSTXU PROJECT COMPLETION

o   CD4 Closeout Review (September 2,2015)

o   DOE-OPA Close Out Report (September 2, 2015)

o   DOE-OPA Final Report (September 2015)

o   CD-4 Approval letter (September 2015)

 

o   PROJECT CLOSEOUT REPORT - FINAL (December 2015)

o   Report without appendices

o   Appendices A through H

o   Appendices I through O

 

 

 

Work Breakdown Structure

o   WBS Dictionary

Work Authorization Forms (WAFs)

Project Status

o   Earned Value Management System (EVMS)

o   Control Account Manager (CAM) Notebook

o   Project Performance & Status

o   Contract Performance Reports (CPRs)

o   Variance Reports

o   Latest Performance Trends

o   Engineering Change Proposals (ECPs)

o   Risk Register

o   Latest Risk Register (R22)

Failure Modes and Effects Analysis

o   Guidance Memo

o   NSTX Upgrades FMEA Update

System Requirements Documents (SRDs)

o   Plasma Facing Surfaces (WBS 11)

o   Vacuum Vessel and Supports (WBS 12)

o   Magnet Systems (WBS 13)

o   Heating Systems (WBS 2X)

o   Auxiliary Systems (WBS 3X)

o   Diagnostic Systems (WBS 4X)

o   Power Systems (WBS 5X)

o   Coil Protection System (WBS 5.2)

o   Central Instrumentation and Control Systems (WBS 6X)

Calculations

System Design Descriptions (SDDs)

o   NBI Upgrade Project

o   Center Stack Upgrade Project

Project Organization and Control

o   Organization Chart

o   Responsibility Assignment Matrix (RAM)

o   Project Management Web Page

o   NSTXU Specific Procedures

o   NSTXU-PROC-001 - NSTXU Configuration Control (Rev 1)

o   NSTXU-PROC-002 - Requests for Deviation (Rev 0)

List of Validated Electronic Signatures

NSTX Upgrades Drag & Drop Folders


Revised: 5/21/2013 / S. Langish