| Note:
 Documentation
is organized by meeting month and day.
  
 The
relevant WBS is in parentheses - (6)
means WBS 6 in our shorthand notation: (SIT) indicates a Systems
Integration Team meeting.
 (CS) indicates a monthly Cost and Schedule Review.
 (Engr)
        indicates a project-wide Engineering meeting.
 
        (Matl) indicates a materials 
        test meeting. 
        (CA) indicates a Critical 
        Activities status meeting 
        (PS) indicates the weekly 
        Project Status telecon 
        (CCB) indicates a Change 
        Control Board meeting 
        (OFES) indicates a meeting 
        with OFES. 
        (DC) indicates Dimensional 
        Control 
        (OSF) indicates On-site 
        Fabrication 
        (Weld) indicates a Weld 
		Trials.  
        (PM) indicates weekly Project 
		Manager meeting with entire project. 
        (WS) indicates a project 
		workshop   |