NBI Decon:  Extensive decon on the beam box and ion dump continues. 
Standing effluent water in the box floor has been syphoned. Remaining puddles 
have been collected using rags. Entry of the box by the Decon crew has started 
using full PCs and breathable air hoods.  Manual wipedowns of internal 
walls and shields has commenced. Ion dump decon continues on external shields 
and internal copper dumps. Outer shields have been removed to increase access to 
the back of the dump plate. The side louvers have been removed for greater 
access also. The louvers have been moved to the Source Shop decon room and 
placed in a fumehood for further decon detailing. A comprehensive survey of 
components is scheduled for the end of this month to support the upcoming Decon 
Peer Review that will be scheduled for the end of April. Remedial decon on the 
Test Cell floor and periphery continues to maintain areas.
Regards,
Tim
Timothy N. Stevenson, NBI Project Manager 
Head 
of Experimental Heating Systems & Neutral Beam Operations
LSB 
316  C Site 
Princeton Plasma Physics Laboratory
Princeton University 
P.O. 
Box 451
Princeton, NJ 08543
Office (609) 
243-2657 
FAX (609) 243-3248
Skypager # : 2047351
You can visit the home page of the DOE Princeton Plasma Physics 
Laboratory