NBI Management: Preparations for the peer review next week continue on all 
jobs. 
NBI Decon:  D2 and guard vac removals are nearly complete. Decon 
wipedowns of the calorimeter continued with variations to test techniques and 
protective equipment. A complete HP survey will take place today to evaluate 
progress.
NBI Relocation: While the NSTX NBI calorimeter was being removed for 
maintenance, measurements were taken to contribute to the hieght rackup for 
beamline travel over the south high bay shield wall.
NBI Power and Control:  Additional details were considered and added 
to the evaluation for locating the High Voltage Enclosures in the NTC.
NBI Duct, VV Port, and Armor:  Concerns about locating and mounting 
the Bay J-K Resistive Wall Mode coil around the proposed vacuum vessel weldment 
required some changes and these ideas are being factored into the models. 
Development of the TVPS system is also underway.
NBI BL Services: Concepts are complete. Layouts are complete. Presentation 
materials for next week are in progress.
NTC Equipment Relocations:  Lists of changes have been prepared for 
presentation next week. A rigorous review with Diagnostics is planned.
Regards,
Tim
Timothy N. Stevenson 
Head 
of Experimental Heating Systems & Neutral Beam Operations
LSB 
316  C Site 
Princeton Plasma Physics Laboratory
Princeton University 
P.O. 
Box 451
Princeton, NJ 08543
Office (609) 
243-2657 
FAX (609) 243-3248
Skypager # : 2047351
You can visit the home page of the DOE Princeton Plasma Physics 
Laboratory