From: Timothy N. Stevenson Sent: Thursday, July 21, 2011 3:59 PM To: Mike Williams Cc: Ronald L. Strykowsky; Alfred von Halle; Erik D. Perry; Mark B. Cropper; John W. Edwards; Thomas E. Egebo; Masayuki Ono; Mike Viola; Martin Denault; Kelsey Tresemer; William R. Blanchard; S. Ramakrishnan; Guy Rossi; Tiana Dodson; Kristopher R. Gilton; John Winkelman; Brian Clark; Guy Grow; Lawrence E. Dudek; Bob Simmons; Orlando Guzman; Victor Garzotto; George Ascione; Keith R. Rule; Maria L. Pueyo; Patricia M. Bruno; Robert A. Hitchner; Richard (Pete) Szaro; Richard J. Van Kirk Subject: NBI Upgrade Weekly Status 7/22/11 Mike NBI Upgrade: Effort continues on NBI drawing changes and post-FDR updates. Armor drawings are being updated to include CFC tile mounting details. The armor calculation document is being prepared for final review. A requisition was prepared and approved for NBPS disconnect switch motors needed to update the high voltage switchgear controls to present configuration. NBI Refurbishment: Preparations continue on the Ion Dump water manifold and the shipping frame required to send the ion dump assembly out for brazing. Review of drawings for the BL support stand are underway to begin fabrication. A list of needed parts and materials for the calorimeter update has been compiled to place orders. Regards, Tim Timothy N. Stevenson NBI Project Manager Head of Office of Project Management Head of Experimental Heating Systems & Neutral Beam Operations LSB 316 C Site Princeton Plasma Physics Laboratory Princeton University P.O. Box 451 Princeton, NJ 08543 Office (609) 243-2657 FAX (609) 243-3248 email: tstevenson@pppl.gov Skypager # : 2047351 You can visit the home page of the DOE Princeton Plasma Physics Laboratory at http://www.pppl.gov