Cc: Mike Williams; Erik D. Perry; Mark B. Cropper; John W. Edwards; Thomas E. Egebo; Masayuki Ono; Ronald L. Strykowsky; Michael E. Viola; Martin Denault; Craig D. Priniski; Subrahmanya Ramakrishnan; Guy Rossi; Charles A. Gentile; Kristopher R. Gilton; John Winkelman; John Mitchell; Brian Clark; Jerome Siegel; Lawrence E. Dudek; Kelsey Tresemer; Bob Simmons; Orlando Guzman; Victor Garzotto; Carl M. Tilson; George Ascione; Keith R. Rule; Maria L. Pueyo; Patricia M. Bruno; Robert A. Hitchner; Richard (Pete) Szaro
Subject: NBI Upgrade Weekly Status 7/31/09
Al,

NBI Upgrade: Cog Engineers prepared draft WAF materials for each job. An NBI BL2 Cost and Schedule Review took place with all jobs reporting their preliminary estimates. Discussions included review of scope, delineation of responsibilities, annotation of the cost basis for M&S, and identification of risk. Some action items were assigned to add detail not captured elsewhere in the job estimates.

NBI Decon:  After one trial lift fixture fit up and subsequent modifications, the BL4 Bending Magnet was successfully removed from the beamline and placed in its stand on the floor of the Test Cell. Preparations continue to remove the 90 inch flange from the beamline. Decon of the calorimeter continues.


Regards,

Tim



Timothy N. Stevenson

Head of Experimental Heating Systems & Neutral Beam Operations

LSB 316  C Site
Princeton Plasma Physics Laboratory
Princeton University
P.O. Box 451
Princeton, NJ 08543

Office (609) 243-2657
FAX (609) 243-3248
email: tstevenson@pppl.gov

Skypager # : 2047351


You can visit the home page of the DOE Princeton Plasma Physics Laboratory
at http://www.pppl.gov