Cc: Mike Williams; Erik D. Perry; Mark B. Cropper; John W. Edwards; Thomas E. Egebo; Masayuki Ono; Ronald L. Strykowsky; Michael Viola; Martin Denault; Craig D. Priniski; Subrahmanya Ramakrishnan; Guy Rossi; Neway Atnafu; Charles A. Gentile; Kristopher R. Gilton; John Winkelman; John Mitchell; Brian Clark; Jerome Siegel; Lawrence E. Dudek; Kelsey Tresemer; Bob Simmons; Orlando Guzman; Victor Garzotto; Carl M. Tilson; George Ascione; Keith R. Rule; Maria L. Pueyo; Patricia M. Bruno; Robert A. Hitchner; Richard (Pete) Szaro
Subject: NBI Upgrade Weekly Status 2/19/10
Al,

NBI Upgrade:  An NBIU Peer Review has been scheduled for early March to review progress on design and analysis. Preparations for the Peer Review are underway. Plans have been developed to test various cutting techniques on stainless plates to simulate the vacuum vessel modification. Armor analysis continues in several areas: the thermal analysis is being benchmarked to operational data and the loads associated with disruption forces has been modeled and estimated. Additional diagnostics details are being considered to add to duct and armor.

NBI Decon:  Decon on lid and box continued this week. Two drums of contaminated water effluent were solidified for disposal. Drum contents have been surveyed for tritium inventory. Low level shield decon also continued as manpower permitted. Plans for decon on the ion dump progressed and include some disassembly to reach areas more conveniently.

Regards,

Tim



Timothy N. Stevenson, NBI Project Manager

Head of Experimental Heating Systems & Neutral Beam Operations

LSB 316  C Site
Princeton Plasma Physics Laboratory
Princeton University
P.O. Box 451
Princeton, NJ 08543

Office (609) 243-2657
FAX (609) 243-3248
email: tstevenson@pppl.gov

Skypager # : 2047351


You can visit the home page of the DOE Princeton Plasma Physics Laboratory
at http://www.pppl.gov