From:����������������������������� Timothy N. Stevenson
Sent:������������������������������ Friday, December 10, 2010 11:36 AM
To:���������������������������������� Alfred von Halle
Cc:���������������������������������� Mike Williams; Erik D. Perry; Mark B. Cropper; John W. Edwards;
Thomas E. Egebo; Masayuki Ono; Ronald L. Strykowsky; Mike Viola; Martin
Denault; Craig D. Priniski; S. Ramakrishnan; Guy Rossi; Neway Atnafu; Charles
A. Gentile; Tiana Dodson; Kristopher R. Gilton; John Winkelman; John Mitchell;
Brian Clark; Jerome Siegel; Lawrence E. Dudek; Kelsey Tresemer; Bob Simmons;
Orlando Guzman; Victor Garzotto; Carl M. Tilson; George Ascione; Keith R. Rule;
Maria L. Pueyo; Patricia M. Bruno; Robert A. Hitchner; Richard (Pete) Szaro
Subject:������������������������� NBI Upgrade Weekly Status 12/10/10
Al,
NBI
Upgrade: NBI jobs were statused this week with all jobs reporting.
Drawing for the prototype mockup of the VV modification are complete and ready
to support prototype testing scheduled to begin next month.
NBI
Refurbishment: Work continues to convert ion dump drawings to CAD. Several
drawings have been completed. These drawings are required to support shop work
to fabricate the new full energy ion dump plate.
Regards,
Tim
Timothy N. Stevenson, ����� NBI
Project Manager���������������������������������������������������������
�����������������������������������������������
Head of Experimental Heating Systems
& Neutral Beam Operations
LSB 316 C Site��������������������������������������������������
Princeton Plasma Physics Laboratory
Princeton University�����������
P.O. Box 451
Princeton, NJ 08543
Office���� (609) 243-2657�����������������������������������
FAX����������������������� (609) 243-3248
email: ��� tstevenson@pppl.gov����������������������������������������
Skypager # : 2047351
You can visit the home page of the
DOE Princeton Plasma Physics Laboratory