From: Timothy N. Stevenson
Sent: Thursday, August 19, 2010 6:08 PM
To: Alfred von Halle
Cc: Mike Williams; Erik D. Perry; Mark B. Cropper; John W. Edwards;
Thomas E. Egebo; Masayuki Ono; Ronald L. Strykowsky; Michael Viola; Martin
Denault; Craig D. Priniski; S. Ramakrishnan; Guy Rossi; Neway Atnafu; Charles
A. Gentile; Kristopher R. Gilton; John Winkelman; John Mitchell; Brian Clark;
Jerome Siegel; Lawrence E. Dudek; Kelsey Tresemer; Bob Simmons; Orlando Guzman;
Victor Garzotto; Carl M. Tilson; George Ascione; Keith R. Rule; Maria L. Pueyo;
Patricia M. Bruno; Robert A. Hitchner; Richard (Pete) Szaro
Subject: NBI Upgrade Weekly Status 8/20/10
Al,
NBI
Upgrade project management is planning an external cost and schedule review
next month as recommended. Participants and charge questions have been
discussed. Detailed design work continues on the TVPS duct turbomolecular pump
magnetic shielding required to use the TMPs close to the vessel. Planning
continues for the tests associated with plasma cutting and the vacuum vessel
modifications.
NBI
Decon: Decon has been completed on BL exit baffle door piece and cryo pipes.
Decon continues on source platform and the BL external water rack. Test Cell
area maintenance has been performed on a routine basis. Tooling required for
taking core samples from the ion dump has been evaluated and this task can be
performed with standard equipment that can be readily purchased.
Regards,
Tim
Timothy N. Stevenson, NBI Project
Manager
Head of Experimental Heating Systems
& Neutral Beam Operations
LSB 316 C Site
Princeton Plasma Physics Laboratory
Princeton University
P.O. Box 451
Princeton, NJ 08543
Office (609) 243-2657
FAX (609) 243-3248
email: tstevenson@pppl.gov
Skypager # : 2047351
You can visit the home page of the
DOE Princeton Plasma Physics Laboratory