Cc: Mike Williams; Erik D. Perry; Mark B. Cropper; John W. Edwards; Thomas E. Egebo; Masayuki Ono; Ronald L. Strykowsky; Michael E. Viola; Martin Denault; Craig D. Priniski; Subrahmanya Ramakrishnan; Guy Rossi; Charles A. Gentile; Kristopher R. Gilton; John Winkelman; John Mitchell; Brian Clark; Jerome Siegel; Lawrence E. Dudek; Kelsey Tresemer; Bob Simmons; Orlando Guzman; Victor Garzotto; Carl M. Tilson; George Ascione; Keith R. Rule; Maria L. Pueyo; Patricia M. Bruno; Robert A. Hitchner; Richard (Pete) Szaro
Subject: NBI Upgrade Weekly Status 8/21/09
Al,

NBI Upgrade:  Each NBI upgrade job has reported to project management for technical, cost, and schedule. The development of the resource loaded schedule is in progress. Several engineers attended the Centerstack Peer Review last week to look at interface and interference issues with the machine and proposed structures especially in the duct region. 

NBI: Duct: A prototype model of the BayJ-K region and weldment concept is being considered to physically evaluate handling, welding access, clearances, and lift issues.

NBI Decon:  The 90 inch flange was removed and lifted off of the BL this week. It has been placed in its stand in the floor area. Decon took place on the magnet. Preparations are underway to test the Lid lift fixture on BL4. The Lid lift is planned for later this month.

NBI Armor: Initial thermal analysis of the neutral beam armor carbon tiles has begun. Various tile materials are being researched and considered.


Regards,

Tim



Timothy N. Stevenson

Head of Experimental Heating Systems & Neutral Beam Operations

LSB 316  C Site
Princeton Plasma Physics Laboratory
Princeton University
P.O. Box 451
Princeton, NJ 08543

Office (609) 243-2657
FAX (609) 243-3248
email: tstevenson@pppl.gov

Skypager # : 2047351


You can visit the home page of the DOE Princeton Plasma Physics Laboratory
at http://www.pppl.gov