NBI Decon:  The 90 inch flange was removed and lifted off of the BL 
this week. It has been placed in its stand in the floor area. Decon took place 
on the magnet. Preparations are underway to test the Lid lift fixture on BL4. 
The Lid lift is planned for later this month.
NBI Armor: Initial thermal analysis of the neutral beam armor carbon tiles 
has begun. Various tile materials are being researched and considered.
Regards,
Tim