From: Timothy N. Stevenson Sent: Friday, April 29, 2011 10:21 AM To: Mike Williams Cc: Alfred von Halle; Erik D. Perry; Mark B. Cropper; John W. Edwards; Thomas E. Egebo; Masayuki Ono; Yuhu Zhai; Ronald L. Strykowsky; Mike Viola; Martin Denault; Kelsey Tresemer; William R. Blanchard; S. Ramakrishnan; Guy Rossi; Neway Atnafu; Charles A. Gentile; Tiana Dodson; Kristopher R. Gilton; John Winkelman; Brian Clark; Guy Grow; Lawrence E. Dudek; Bob Simmons; Orlando Guzman; Victor Garzotto; Carl M. Tilson; George Ascione; Keith R. Rule; Maria L. Pueyo; Patricia M. Bruno; Robert A. Hitchner; Richard (Pete) Szaro; Richard J. Van Kirk Subject: NBI Upgrade Weekly Status 4/29/11 Al, NBI Upgrade: Design details have been added to the TVPS system models. Work on drawings for TVPS, services, and controls continues. The prototype set up continues and is ready for welding. Three minor chits were generated at the Peer Review and have been dispositioned, assigned, and logged. Management participated in the CS weekly meeting and ongoing EVMS certification preparations. Existing NBI drawings are being evaluated for the duct, cryogenics system, and services also. NBI Refurbishment: Core drilling of the old full energy ion dump has been completed. Machining on the replacement full energy ion dump continues in the shop. Addendum: Kelsey Tresemer has taken over the Armor job as COG. The old full energy ion dump has been removed from the lid and placed on the floor for eventual packaging and disposal Regards, Tim Timothy N. Stevenson, NBI Project Manager Head of Office of Project Management Head of Experimental Heating Systems & Neutral Beam Operations LSB 316 C Site Princeton Plasma Physics Laboratory Princeton University P.O. Box 451 Princeton, NJ 08543 Office (609) 243-2657 FAX (609) 243-3248 email: tstevenson@pppl.gov Skypager # : 2047351 You can visit the home page of the DOE Princeton Plasma Physics Laboratory at http://www.pppl.gov