From: Timothy N. Stevenson
Sent: Friday, April 29, 2011 10:21 AM
To: Mike Williams
Cc: Alfred von Halle; Erik D. Perry; Mark B. Cropper; John W. Edwards;
Thomas E. Egebo; Masayuki Ono; Yuhu Zhai; Ronald L. Strykowsky; Mike Viola;
Martin Denault; Kelsey Tresemer; William R. Blanchard; S. Ramakrishnan; Guy
Rossi; Neway Atnafu; Charles A. Gentile; Tiana Dodson; Kristopher R. Gilton;
John Winkelman; Brian Clark; Guy Grow; Lawrence E. Dudek; Bob Simmons; Orlando
Guzman; Victor Garzotto; Carl M. Tilson; George Ascione; Keith R. Rule; Maria
L. Pueyo; Patricia M. Bruno; Robert A. Hitchner; Richard (Pete) Szaro; Richard
J. Van Kirk
Subject: NBI Upgrade Weekly Status 4/29/11
Al,
NBI
Upgrade: Design details have been added to the TVPS system models. Work
on drawings for TVPS, services, and controls continues. The prototype set
up continues and is ready for welding. Three minor chits were generated at the
Peer Review and have been dispositioned, assigned, and logged. Management
participated in the CS weekly meeting and ongoing EVMS certification
preparations. Existing NBI drawings are being evaluated for the duct,
cryogenics system, and services also.
NBI
Refurbishment: Core drilling of the old full energy ion dump has been
completed. Machining on the replacement full energy ion dump continues in the
shop.
Regards,
Tim
Timothy N. Stevenson, NBI
Project Manager
Head of
Office of Project Management
Head of Experimental Heating Systems
& Neutral Beam Operations
LSB 316 C Site
Princeton Plasma Physics Laboratory
Princeton University
P.O. Box 451
Princeton, NJ 08543
Office (609) 243-2657
FAX (609) 243-3248
email: tstevenson@pppl.gov
Skypager # : 2047351
You can visit the home page of the
DOE Princeton Plasma Physics Laboratory