From: 
Lawrence E. Dudek
Sent: Wednesday, December 16, 2009 4:49 
PM
To: Bob Simmons
Subject: Reminder: NSTX CSU Project 
Meeting today at 2:30
Attachments: Model with 
PF45SupportOnVessel.bmp; ATT9807644.htm; LoadSlide.ppt; ATT9807645.htm
NSTX CS 
Upgrade
scheduled November 25, 2009 
from 2:30 PM to 3:30 PM
Location: New Engineering 
Conference Rm.
If anyone has presentation 
materials please send them to me before the meeting.
 
Notes from last weeks meeting:
Mangra reviewed the latest PF Coil support requirements based on the 
operational requirements:
PF2 &PF3 
supports can be upgraded by changing bolts out.
PF4 & 5 will 
need coil to coil supports along with stronger PF5 U to L columns.  
The existing 
legs to the Vacuum Vessel are okay.
Discussed the 
interest in the acceleration measurement system.  Danny will be putting 
together a parts list for the system with input from operations group.
Titus reviewed the attached slides on the GRD and progress on the model 
changes to incorporate the "cageless" PF4-5 design.