NSTX Upgrade

Readiness for Operations Review

December 9-11th, 2014
Princeton Plasma Physics Laboratory

Review Documents

Readiness Review Criteria and Requirements

·       NSTXU Readiness To Operate Requirements

 

·       Objective Criteria for Assessing Safe NSTXU Startup

 

·       NSTXU Safety Assessment Document       SAD     Recent Updates

 

·       NSTXU Failure Modes and Effects Analysis (FMEA)

 

Supporting Documentation

·       Engineering Design Implementation flow chart and procedures

·       NSTX Design Review Chit Log      (PDF)       (Excel spreadsheet)

 

·       NSTX Administrative Procedures

·       Access to NSTXU Experimental Areas -OP-AD-117

·       Chain Of Commnd-OP-AD-56

·       Control Of Temp Mods-ENG-036

·       Control Of Workplace Cleanliness D-site -OP-AD-24

·       D-Site Work Permits-OP-AD-09  

·       Conduct of Operations OP-AD-39

 

 

·       PPPL ES&H Directives (“Safety Manual”) Section 11.0

Section 11.0 - Operations Hazard Criteria and Safety Certification

 

·       OP-NSTX-12, NSTXU Operations Training

 

·       OP-NSTX-02, Start Up Of NSTX-U

 

·       NSTX-ISTP-01, NSTX Coil Energization Tests.

 

·       NSTX-U Project Execution Plan, Section 2.2.2, Project Completion Criteria.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 