	Center Stack Upgrade Management Plans and Procedures 
    NOTE:  THESE SIGNED PLANS ARE 
    PROTECTED TO PRECLUDE UNAUTHORIZED CHANGES.  IF YOU NEED TO PRINT THESE 
    DOCUMENTS AS UNCONTROLLED COPY, PLEASE USE THE PASSWORD "ncsx" (ALL LOWER 
    CASE WITHOUT THE QUOTES). | 
    
    | Name of Plan | Currently Approved 
    Revision |   
    Drafts/Revisions in Process | Peer 
	Reviews of Initial Issue | 
    
    | 
	Plans
	Approved by DOE |  |  |  | 
    
    | Acquisition Execution Plan (AEP) |  |  |  | 
    
    | Project Execution Plan 
	(PEP) | 
	
	Draft Version 6 | 
      |  | 
    
    | 
	Plans
	Approved by Project |  |  |  | 
    
    | Systems Engineering Management Plan 
	(SEMP) |   | 
      |  | 
	
    | Quality 
    Assurance Plan (QAP) |  |   |  | 
    
    | Configuration Management Plan 
	(CMP) |  |  |  | 
    
    | Data 
    Management Plan (DMP) |  |  |  | 
    
    | Document 
    and Records Plan
    
    (DOC) | 
      |  |  | 
    
    | Interface 
    Control Management Plan (ICMP) | 
      | 
      |  | 
    
    | Reliability, Availability, and 
    Maintainability Plan (RAM) | 
      |   |  | 
    
    | Test and Evaluation Plan (TEP) |  |  |  | 
    
    | Risk Management Plan (RMP) | 
      |   |  | 
    
    | Training Plan (TRNG) |  |   |  | 
    
    | 
  | 
    
    | Name of 
	Project Procedure | Currently Approved 
    Revision |  
    Drafts/Revisions in Process | Peer 
	Reviews of Initial Issue | 
    
    |  |  |  |  | 
    
    |  |  |  |  |