National Spherical Torus Experiment (NSTX) Center Stack Upgrade Project

NSTX CSU Web Pages  

Overview| Conferences |

NCSX FTP Sites  

    |

Navigation Trail  

Engineering > Systems Engineering > Project Plans and Procedures

NSTX Center Stack Upgrade Management Plans and Procedures

NOTE:  THESE SIGNED PLANS ARE PROTECTED TO PRECLUDE UNAUTHORIZED CHANGES.  IF YOU NEED TO PRINT THESE DOCUMENTS AS UNCONTROLLED COPY, PLEASE USE THE PASSWORD "ncsx" (ALL LOWER CASE WITHOUT THE QUOTES).

Name of Plan

Currently Approved Revision

  Drafts/Revisions in Process

Peer Reviews of Initial Issue

Plans Approved by DOE

     
 Acquisition Execution Plan (AEP)      
Project Execution Plan (PEP)

Draft Version 6

 

 

Plans Approved by Project

     
Systems Engineering Management Plan (SEMP)

 

 

 
Quality Assurance Plan (QAP)  

 

 
Configuration Management Plan (CMP)      
Data Management Plan (DMP)      
Document and Records Plan (DOC)

 

   
Interface Control Management Plan (ICMP)

 

 

 
Reliability, Availability, and Maintainability Plan (RAM)

 

 

 
Test and Evaluation Plan (TEP)      
Risk Management Plan (RMP)

 

 

 
Training Plan (TRNG)  

 

 
 

Name of Project Procedure

Currently Approved Revision

Drafts/Revisions in Process

Peer Reviews of Initial Issue

       
       
 
   

Privacy and Security Notice

Please forward comments and questions to the Webmaster