NSTX
Center Stack Upgrade Management Plans and Procedures
NOTE: THESE SIGNED PLANS ARE
PROTECTED TO PRECLUDE UNAUTHORIZED CHANGES. IF YOU NEED TO PRINT THESE
DOCUMENTS AS UNCONTROLLED COPY, PLEASE USE THE PASSWORD "ncsx" (ALL LOWER
CASE WITHOUT THE QUOTES). |
Name of Plan |
Currently Approved
Revision |
Drafts/Revisions in Process |
Peer
Reviews of Initial Issue |
Plans
Approved by DOE |
|
|
|
Acquisition Execution Plan (AEP) |
|
|
|
Project Execution Plan
(PEP) |
Draft Version 6 |
|
|
Plans
Approved by Project |
|
|
|
Systems Engineering Management Plan
(SEMP) |
|
|
|
Quality
Assurance Plan (QAP) |
|
|
|
Configuration Management Plan
(CMP) |
|
|
|
Data
Management Plan (DMP) |
|
|
|
Document
and Records Plan
(DOC) |
|
|
|
Interface
Control Management Plan (ICMP) |
|
|
|
Reliability, Availability, and
Maintainability Plan (RAM) |
|
|
|
Test and Evaluation Plan (TEP) |
|
|
|
Risk Management Plan (RMP) |
|
|
|
Training Plan (TRNG) |
|
|
|
|
Name of
Project Procedure |
Currently Approved
Revision |
Drafts/Revisions in Process |
Peer
Reviews of Initial Issue |
|
|
|
|
|
|
|
|