National Spherical Torus Experiment (NSTX) Upgrades
o PDR Agenda and Presentations
o PDR Directory (Reviewers, Attendees, Project Staff)
o Documentation
Project Execution Plan (DRAFT)
Failure Modes and Effects Analysis (FEMA)
FEMA (Rev 7)
General Requirements Documents (GRD)
System Requirements Documents (SRDs)
NBI SRD
Centerstack Upgrade SRDs
Plasma Facing Components (WBS 11)
Vacuum Vessel and Supports (WBS 12)
Magnet Systems (WBS 13)
Auxiliary Systems (WBS 3X)
Diagnostic Systems (WBS 4X)
Power Systems (WBS 4X)
Central Instrumentation and Control Systems (WBS 6X)
Work Breakdown Structure
Detailed WBS Dictionary (DRAFT 10/22/2009)
Resource Loaded Schedule
Summary Schedule & Milestones
Detailed Resource Loaded Schedule
Financial Summary (BA/BO analysis, etc.)
Cost Table (by WBS and Year)
Acquisition Strategy (DRAFT 10/27/2009)
NEPA Documentation
Environmental Evaluation Notification Form (Categorical Exclusion)