NSTX-Upgrade Project WBS
|
|
|
WBS |
WAF (Detail of Estimate) |
WBS Manager |
Responsible Job Manager |
1.1 Torus Systems |
Dudek |
|
|
1.1.0 Overall NSTX Upgrade Project Integrated Model
|
|
|
|
|
|
1000 |
CSU Analytical Support |
P. Titus |
|
1.1.1 Plasma Facing Components |
|
|
|
|
|
1001 |
CS- Plasma Facing Components |
K. Tresemer |
|
|
|
|
1002 |
Passive Plate Analysis and Upgrade Activities |
P. Titus |
|
1.1.2 Vacuum Vessel & Support Structure |
|
|
|
|
|
1200 |
CSU Structural Supports |
D. Mangra |
|
1.1.3 Magnet Systems |
|
|
|
|
|
|
1300 |
Center Stack Design Support |
J. Chrzanowski |
|
|
1.1.3.1 Outer Polidal Field Coils |
|
|
|
1.1.3.2 Outer Toroidal Field Coils |
|
|
|
|
|
1301 |
Outer TF Coil Repairs |
J. Chrzanowski |
|
|
1.1.3.3 Center Stack |
|
|
|
|
|
1302 |
Center Stack Assembly |
J. Chrzanowski |
|
|
|
1.1.3.3.1 TF Inner legs |
|
|
|
|
|
1303 |
TF Joint Test Stand & Performance of Test |
T. Kozub |
|
|
|
|
1304 |
Inner TF Bundle- Design & Fabrication |
J. Chrzanowski |
|
|
|
1.1.3.3.2 Ohmic Heating Solenoid |
|
|
|
|
|
1305 |
Ohmic Heating Coil (OH) |
J. Chrzanowski |
|
|
|
1.1.3.3.3 Shaping Coils |
|
|
|
|
|
1306 |
Inner Poloidal Field Coils (IPF) |
J. Chrzanowski |
|
|
|
1.1.3.3.4 Center Stack Casing |
|
|
|
|
|
1307 |
CS Casing Assembly- Design & Fabrication |
J. Chrzanowski |
1.2 Plasma Heating and Current Drive Systems |
Stevenson |
|
|
1.2.1 High Harmonic Fast Wave |
n/a |
|
1.2.2 Coaxial Helicity Injection Current Drive |
n/a |
|
1.2.3 Electron Cyclotron Heating |
n/a |
|
|
|
|
2300 |
ECH |
P. Titus |
|
1.2.4 Neutral Beam Injection |
|
|
|
|
|
2420 |
NBI - Sources |
Cropper |
|
|
|
|
2425 |
NBI - Beamline Relocation |
Denault |
|
|
|
|
2430 |
NBI - Decontamination |
T. Stevenson |
|
|
|
|
2440 |
NBI - Beamline Refurbishment |
Denault |
|
|
|
|
2450 |
NBI - Services |
Denault |
|
|
|
|
2460 |
NBI - Armor/Protective Plates |
Priniski |
|
|
|
|
2470 |
NBI - Power |
Raki |
|
|
|
|
2475 |
NBI - Controls |
Cropper |
|
|
|
|
2480 |
NBI - Nozzle/Duct |
Priniski |
|
|
|
|
2490 |
NBI - Equipment Relocations |
R. Perry |
1.3 Auxiliary Systems |
|
Dudek |
|
|
1.3.1 Vacuum Pumping Systems |
|
|
|
|
|
2485 |
Vacuum Pumping Systems |
Priniski |
|
1.3.2 Coolant Systems |
|
|
|
|
|
|
3200 |
Water Cooling System Mods for CSU |
M. Denault |
|
1.3.3 Bakeout System |
|
|
|
|
|
|
3300 |
Bakeout System mods for CSU |
S. Raki |
|
1.3.4 Gas Delivery Systems |
|
|
|
|
|
3400 |
Gas Delivery System Mods for CSU |
W. Blanchard |
|
1.3.5 Glow Discharge Cleaning System |
n/a |
1.4 Plasma Diagnostics |
|
Kaita |
|
|
1.4.1 |
|
|
4100 |
Center Stack Diagnostics for CSU |
R. Kaita |
1.5 Power Systems |
|
|
Raki |
|
|
1.5.0
Center Stack Power System Upgrades |
|
|
|
|
|
5000 |
CS Power Systems |
Raki
|
|
1.5.1
AC Power Systems |
n/a - in 1.5.0 |
|
1.5.2
TF Power Conversion Systems |
n/a - in 1.5.0 |
|
1.5.3
PF/OH Power Conversion Systems |
n/a - in 1.5.0 |
|
1.5.4
CHI Power Conversion Systems |
n/a - in 1.5.0 |
|
1.5.5
General Power Systems & Integration |
n/a - in 1.5.0 |
|
1.5.6 Coil Bus Run Upgrades |
|
|
|
|
|
5501 |
Coil Bus Runs |
J. Chrzanowski |
1.6 Central Instrumentation & Control |
Sichta |
|
|
1.6.0 Control & Data Systems Upgrades |
|
|
|
|
|
6100 |
Control System & Data Acquisition System |
Sichta |
|
1.6.1
Control System |
n/a - in 1.6.0 |
|
1.6.2
Data Acquisition System |
n/a - in 1.6.0 |
1.7 Project Support & Integration |
Perry |
|
|
1.7.1
Project Management & Integration |
|
|
|
|
|
7100 |
Project Management & Integration |
E.Perry |
|
1.7.2
Center Stack Upgrade Management |
|
|
|
|
|
7200 |
Center Stack Management |
L.Dudek |
|
1.7.3
NB 2 Upgrade Management |
|
|
|
|
|
7300 |
NB2 Management |
T.Stevenson |
|
1.7.4
Health Physics Technical Support |
|
|
|
|
|
7400 |
Health Physics
Technical Support |
T.Stevenson |
|
1.7.7
Direct Allocations |
|
|
|
|
|
7700 |
Health Physics
Direct Allocations |
R.Strykowsky |
|
|
|
|
7710 |
Direct Allocations |
R.Strykowsky |
|
1.7.9
Integrated Systems Testing |
|
|
|
|
|
7900 |
Integrated Systems Testing |
C. Gentile |
1.8 Site Preparation and Torus Assembly |
Perry |
|
|
1.8.1 Site Preparation |
|
n/a |
|
1.8.2 Center Stack and Coil Structure Upgrades |
|
|
|
|
|
8200 |
Centerstack and Coil Structure Installation |
M. Viola |
|
|
|
|
8250 |
Centerstack removal & re-installation |
M. Viola |